Advertisement

Advertisement

Cutting it down to size

Right before Christmas the 425 Mass apartments trimmed several feet off the retainer wall enclosing their 4th Street entrance and handicap ramp. This is a worthwhile upgrade as rather than projecting “keep out” it just does the bare minimum to conceal the ramp and stairs from the sidewalk.

Contractors cutting down wall at 425 Mass on 12/22/2010

BEFORE IMAGE: wall is over 5 ft high; from Google Streetview

AFTER IMAGE: 425 Mass wall cut down to be just higher than stair landing

Be the first to like.

Related Posts

SociBook del.icio.us Digg Facebook Google Yahoo Buzz StumbleUpon